0
My Basket Basket

You have no items in your shopping basket.

0116 2741050
Monday - Friday 8am - 5:30pm | Saturday 9am - 1pm

 

Bona Traffic HD Lacquer 4.5Ltr

Product Code: BTRAFFHD

Be the first to review this product

£102.50 Incl. VAT
  • Buy 2 for £100.18 each and save 3%
    £100.18 Incl.
    VAT
  • Buy 3 for £97.18 each and save 6%
    £97.18 Incl.
    VAT
  • Buy 6 for £94.18 each and save 9%
    £94.18 Incl.
    VAT

* Required Fields

£102.50 Incl. VAT

Availability: In stock

Product Advantages

Bona Traffic HD is a 2-component waterborne topcoat, it has been developed for surface treating wooden floors in public areas with high traffic intensity

Extreme durability and scratch resistance

Exceptionally fast hardness development.

Very low odour and Low solvent content (VOC), <5%.

DIBt approved for low indoor emissions

Suitable for overcoating compatible pre-finished floors

Clear, non-yellowing formula.

 

Technical Spec
Coverage rate: 8-10 m² /litre (100-120g/m² ) per coat

Drying time, until: - Ready for sanding/recoating: 2-3 hours* - Full use: 24 hours*
*under normal climate conditions, 20°C/60% R.H.

 

Preparation

Prior to application the surface must be pre-treated with a waterborne primer from Bona. Ensure floor is acclimatized to its end-use environment, well sanded, dry and free from sanding dust, oil, wax and other contamination. Allow lacquer to reach room temperature, insert filter and shake the container thoroughly before use. Optimal application conditions are between 18-25°C and 30-60% relative air humidity.

High temperatures and low humidity shorten, low temperatures and high humidity lengthen drying time. Minimum temperature for use is 13°C.

 

Application

1. Shake the Traffic HD can and add one bottle of Traffic HD Hardener; immediately shake the mixture thoroughly for 1 minute and then insert the enclosed filter. If mixing smaller quantities of varnish then pour the required amount of varnish into a separate can. 1 litre of varnish corresponds to one part of hardener. 2 litres to two parts and so on. The mixture of varnish/hardener should be used directly or at least within 4 hours.

2. Apply the lacquer using a medium pile Roller. Roll with a smooth flowing motion alternately across and with the grain of the wood avoiding accumulations of product. Always maintain a “wet edge” to avoid overlaps. Allow to dry before applying further layers of lacquer. Anticipate slightly longer drying time for each layer that is applied.

3. If necessary make an intermediate sanding using a screen or the Bona Scrad System grit P150 (or finer) and remove dust before applying the final layer of lacquer. Note: If the previous layer of lacquer has been allowed more than 24 hours drying time then an intermediate sanding is always required.

The floor will take light foot traffic approximately 8 hours after the final application and may be put into full use after 24 hours. Allow the surface to dry for at least 1 week before covering with carpets or other floor coverings, or loading with heavy objects. Also avoid damp mopping the floor during this time.


Cleaning

Cleaning: Wipe tools free from excess lacquer before cleaning with water. Dried material can be removed with acetone

 

Maintenance / Aftercare

Clean the floor with Bona Cleaner or Bona Wood Floor Cleaner and a microfibre pad.(These can be purchased together with a Bona spray mop). For maintenance and upkeep of the surface, floors can be overcoated at intervals with additional coats of lacquer. The frequency of this operation can be greatly reduced if Bona Freshen Up or Bona Wood Floor Refresher is applied periodically. This will restore the appearance of a dull floor whilst still allowing further coats of lacquer to be applied without the need for sanding the floor back to bare timber


Storage / Shelf life
Shelf life: 1 year from date of production in unopened original container
The temperature must not fall below +5°C or exceed +25°C during storage

Certifications: 
GreenGuard Gold

DIBt; safe building product

EN 14904:2006; approved friction for sports floors

DIN 18032:2; approved friction for sports floors

EN 13501-1; Reaction to fire

Product Advantages

Bona Traffic HD is a 2-component waterborne topcoat, it has been developed for surface treating wooden floors in public areas with high traffic intensity

Extreme durability and scratch resistance

Exceptionally fast hardness development.

Very low odour and Low solvent content (VOC), <5%.

DIBt approved for low indoor emissions

Suitable for overcoating compatible pre-finished floors

Clear, non-yellowing formula.

 

Technical Spec
Coverage rate: 8-10 m² /litre (100-120g/m² ) per coat

Drying time, until: - Ready for sanding/recoating: 2-3 hours* - Full use: 24 hours*
*under normal climate conditions, 20°C/60% R.H.

 

Preparation

Prior to application the surface must be pre-treated with a waterborne primer from Bona. Ensure floor is acclimatized to its end-use environment, well sanded, dry and free from sanding dust, oil, wax and other contamination. Allow lacquer to reach room temperature, insert filter and shake the container thoroughly before use. Optimal application conditions are between 18-25°C and 30-60% relative air humidity.

High temperatures and low humidity shorten, low temperatures and high humidity lengthen drying time. Minimum temperature for use is 13°C.

 

Application

1. Shake the Traffic HD can and add one bottle of Traffic HD Hardener; immediately shake the mixture thoroughly for 1 minute and then insert the enclosed filter. If mixing smaller quantities of varnish then pour the required amount of varnish into a separate can. 1 litre of varnish corresponds to one part of hardener. 2 litres to two parts and so on. The mixture of varnish/hardener should be used directly or at least within 4 hours.

2. Apply the lacquer using a medium pile Roller. Roll with a smooth flowing motion alternately across and with the grain of the wood avoiding accumulations of product. Always maintain a “wet edge” to avoid overlaps. Allow to dry before applying further layers of lacquer. Anticipate slightly longer drying time for each layer that is applied.

3. If necessary make an intermediate sanding using a screen or the Bona Scrad System grit P150 (or finer) and remove dust before applying the final layer of lacquer. Note: If the previous layer of lacquer has been allowed more than 24 hours drying time then an intermediate sanding is always required.

The floor will take light foot traffic approximately 8 hours after the final application and may be put into full use after 24 hours. Allow the surface to dry for at least 1 week before covering with carpets or other floor coverings, or loading with heavy objects. Also avoid damp mopping the floor during this time.


Cleaning

Cleaning: Wipe tools free from excess lacquer before cleaning with water. Dried material can be removed with acetone

 

Maintenance / Aftercare

Clean the floor with Bona Cleaner or Bona Wood Floor Cleaner and a microfibre pad.(These can be purchased together with a Bona spray mop). For maintenance and upkeep of the surface, floors can be overcoated at intervals with additional coats of lacquer. The frequency of this operation can be greatly reduced if Bona Freshen Up or Bona Wood Floor Refresher is applied periodically. This will restore the appearance of a dull floor whilst still allowing further coats of lacquer to be applied without the need for sanding the floor back to bare timber


Storage / Shelf life
Shelf life: 1 year from date of production in unopened original container
The temperature must not fall below +5°C or exceed +25°C during storage

Certifications: 
GreenGuard Gold

DIBt; safe building product

EN 14904:2006; approved friction for sports floors

DIN 18032:2; approved friction for sports floors

EN 13501-1; Reaction to fire

Additional Information

Additional Information

Show Bona Logo No
Show Uniclic Logo No
Show FSC Logo No
Visit our sister site

{message}

{upsell products}